CX-009706: Categorical Exclusion Determination

Keeler Substation-Control House Expansion CX(s) Applied: B4.11 Date: 12/04/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

December 4, 2012
Estimated Read Time   min
Keeler Substation-Control House Expansion
CX(s) Applied: B4.11
Date: 12/04/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to expand the control house within its existing Keeler Substation near Hillsboro, Oregon.