Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 14, 2013Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project
CX(s) Applied: B4.6
Date: 06/14/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to remove six power circuit breakers (PCBs) and install new PCBs within BPA’s Alvey Substation near the City of Springfield in Lane County, Oregon.
CX(s) Applied: B4.6
Date: 06/14/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to remove six power circuit breakers (PCBs) and install new PCBs within BPA’s Alvey Substation near the City of Springfield in Lane County, Oregon.