Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Gas Chromatography CX(s) Applied: B3.6 Date: 12/29/2011 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Optimized Ports Assessment CX(s) Applied: A9, A11 Date: 12/20/2011 Location(s): Oregon Offices(s): Golden Field Office
Significant Cost Improvement of Lithium-Ion Cells CX(s) Applied: B5.1 Date: 12/20/2011 Location(s): California, Michigan, Wisconsin, Oregon Offices(s): National Energy Technology Laboratory
Novel Engineered Osmosis Technology: A Comprehensive Approach to Treatment & Reuse of Produced Water CX(s) Applied: B3.6 Date: 12/20/2011 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Transforming Photovoltaic Installations Toward Discpatchable, Schedulable Energy Solutions CX(s) Applied: A9, B3.6 Date: 12/14/2011 Location(s): Oregon Offices(s): Golden Field Office
Modification of Metering Systems in Canby, Oregon CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration