Sitewide Categorical Exclusion for Research Activities in Aquatic Environments CX(s) Applied: B3.16 Date: 03/28/2012 Location(s): Oregon, Washington, Idaho Offices(s): Pacific Northwest Site Office
La Pine-Chiloquin Number 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 03/21/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Echo Point Community Wind Generation Project CX(s) Applied: B1.7 Date: 03/20/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Pearl-Marion #1 Tower 6/2 Replacement Project CX(s) Applied: B4.6 Date: 02/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Severe Environment Corrosion and Erosion Research Facility CX(s) Applied: B3.6 Date: 02/22/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Pearl Substation 500-Kilovolt #6 Bay Addition CX(s) Applied: B4.6 Date: 02/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration