Port Townsend Paper Corporation Power Sales Agreement Amendment CX(s) Applied: B4.1 Date: 04/01/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Analytical Physics - Scanning Electron Microscope CX(s) Applied: B3.6 Date: 02/19/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Malin Substation Storm Drain and Switchyard Rock Improvements CX(s) Applied: B1.3 Date: 02/06/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Analytical Physics - Transmission Electron Microscopy (TEM) CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Analytical Physics - Thermal Analysis CX(s) Applied: B3.6 Date: 01/30/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
McNary Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 01/29/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Building 26 FSARS CX(s) Applied: B1.3, Facility operation and maintenance Date: 01/28/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Lightspeed Network's Fiber Installation near Pilot Butte Substation CX(s) Applied: B4.7 Date: 01/15/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
The Pacific Marine Energy South Energy Test Site (PMEC-SETS) CX(s) Applied: A9 Date: 01/15/2014 Location(s): Oregon Offices(s): Golden Field Office
Equipment and Property Transfers with Three Public Utilities in Oregon, Idaho and Washington CX(s) Applied: B1.124 Date: 12/26/2013 Location(s): Oregon, Idaho, Washington Offices(s): Bonneville Power Administration