Categorical Exclusion Determinations: Oregon

Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration
Upgrade of the Secondary Containment System at Bonneville Power Administration’s (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
45-Mile Hydroelectric Power Project Demonstration of New Methodologies to Reduce the LCOE for Small Hydropower Development (Formerly 51 Mile Project) CX(s) Applied: B5.15 Date: 05/22/2012 Location(s): Oregon Offices(s): Golden Field Office
Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville ...