Building 33 Conference Room Upgrades CX(s) Applied: B1.7 Date: 08/28/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 28-33 External Electrical Upgrades CX(s) Applied: B1.23, B2.5, B4.6, B4.13 Date: 08/24/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Midstate Electric Cooperative, Inc, Integration Request, Line and Load Interconnection Request L0296 CX(s) Applied: B4.11 Date: 08/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Railroad Island Property Funding CX(s) Applied: B1.25 Date: 08/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Advancing Energy Efficiency in the Northwest CX(s) Applied: A9, A11 Date: 08/22/2012 Location(s): Oregon Offices(s): Golden Field Office
Building 22 Electrical Upgrades CX(s) Applied: B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Building 29-31 Internal Electrical Upgrades CX(s) Applied: B2.1, B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Wave Energy Technology- New Zealand Multi-Mode Wave Energy Converter Advancement Project CX(s) Applied: A9, B3.6 Date: 08/20/2012 Location(s): Oregon Offices(s): Golden Field Office
Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project CX(s) Applied: B1.3 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration