Assessing the Response of Methane Hydrates to Environmental Change at the Svalbard Continental Margin CX(s) Applied: B3.6, Other: Biological & Geochemical Analysis-Lab Date: 09/17/2013 Location(s): Oregon Offices(s): National Energy Technology Laborat...
Hebo Substation Access Road Maintenance CX(s) Applied: B1.3 Date: 09/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Alvey-Lane #1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Buildings 7-11 Sidewalk Replacement CX(s) Applied: B1.15, B2.1, B2.5 Date: 09/11/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
McLoughlin Substation Equipment Additions CX(s) Applied: B1.7 Date: 09/05/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Line Upgrade on Bonneville Power Administration’s Walla Walla-Pendleton Number 1 Transmission Line CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration
Evolving Robust and Reconfigurable Multi-Objective Controllers for Advanced Power Systems CX(s) Applied: A9 Date: 08/29/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Induction Furnace Melting CX(s) Applied: B3.6 Date: 08/29/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Minto Island Property Funding CX(s) Applied: B1.25 Date: 08/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Fiscal Year 2014 Technology Innovation Portfolio CX(s) Applied: B5.1, B3.6 Date: 08/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration