2014 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 04/28/2014 Location(s): Oregon, Oregon, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration
High Pressure Immersion and Reactive Transport Laboratory CX(s) Applied: B3.6 Date: 04/28/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
John Day Powerhouse-John Day Number 1-4 Conductor Replacements CX(s) Applied: B1.3 Date: 04/25/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Meter Installation at Fossil Lake Solar Project CX(s) Applied: B1.7 Date: 04/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
High Temperature Laboratory CX(s) Applied: B3.6 Date: 04/21/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Hat Rock Tap Switching Station Equipment Transfer CX(s) Applied: B1.24 Date: 04/10/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Marion-Alvey Marion-Lane Insulator Replacement Project CX(s) Applied: B1.3 Date: 04/07/2014 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Building 4 FSARS CX(s) Applied: B1.3 Date: 04/02/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Port Townsend Paper Corporation Power Sales Agreement Amendment CX(s) Applied: B4.1 Date: 04/01/2014 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Analytical Physics - Scanning Electron Microscope CX(s) Applied: B3.6 Date: 02/19/2014 Location(s): Oregon Offices(s): National Energy Technology Laboratory