High Flux Microchannel Solar Receiver Development with Adaptive Flow Control CX(s) Applied: B3.6, B5.17 Date: 08/08/2012 Location(s): Oregon Offices(s): Golden Field Office
Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Celilo Converter Station Curtain Wall Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Power Monitoring System Installation CX(s) Applied: B1.3, B1.15 Date: 08/08/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Clean Start - Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 08/01/2012 Location(s): Arizona, Colorado, Oregon, Texas, Washington Offices(s): National Energy Technology Laboratory
Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Oregon State University- Natural Gas Self-contained Home Filling Station CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Oregon, Colorado, Michigan Offices(s): Advanced Research Projects Agency-Energy
Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 07/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration