Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Ad...
Bertelsen Substation Metering Panel Segment Addition CX(s) Applied: B1.7 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Sale of Lakeside Radio Station CX(s) Applied: B1.24 Date: 12/27/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Direct Drive Wave Energy Buoy CX(s) Applied: A9, B3.6 Date: 12/19/2012 Location(s): Oregon Offices(s): Golden Field Office
Pacific Marine Energy Center Fiscal Year 2012 Funding CX(s) Applied: A9, A11, B3.6 Date: 12/10/2012 Location(s): Oregon Offices(s): Golden Field Office
Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Alcoa Power Sales Contract CX(s) Applied: B4.1 Date: 12/04/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
Keeler Substation-Control House Expansion CX(s) Applied: B4.11 Date: 12/04/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
FY13 Environmental Drainage Upgrades at Bonneville Power Administration’s Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offic...