CX-012197: Categorical Exclusion Determination

Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14) CX(s) Applied: B4.11 Date: 04/30/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

April 30, 2014
Estimated Read Time   min
"Celilo Converter Station Upgrades (update to previous CX issued on 7/25/13 and 3/11/14)
CX(s) Applied: B4.11
Date: 04/30/2014
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to upgrade its Celilo Converter Station. In addition to the work described in the previous categorical exclusions for this project (July 25, 2013 and March 11, 2014), BPA proposes to replace three buried power supply cables that run about a half mile in existing BPA fee-owned right-of-way between Big Eddy Substation and the Celilo Converter Station. "