Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Revenue Meter Replacement at Oregon Trail Electric Co-op’s (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Eugene Substation Protective Relay Installation CX(s) Applied: B1.7 Date: 01/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Provision of Funds to Acquire a Conservation Easement Over the 310-acre Coyote Creek property. CX(s) Applied: B1.25 Date: 01/23/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Building 4 Drain Line Replacement CX(s) Applied: B1.3, B1.15, B1.31 Date: 01/08/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Wave Energy Technology- New Zealand Multi-Mode Wave Energy Converter Advancement Project CX(s) Applied: A9 Date: 01/08/2013 Location(s): Hawaii, Oregon Offices(s): Golden Field Office
Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Ad...