Big Eddy-Redmond No.1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 08/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 14, 2013Big Eddy-Redmond No.1 Wood Pole Replacement Project
CX(s) Applied: B1.3
Date: 08/14/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to replace 45 deteriorating wood pole structures along its Big Eddy-Redmond transmission line located in Deschutes County, Oregon.
CX(s) Applied: B1.3
Date: 08/14/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to replace 45 deteriorating wood pole structures along its Big Eddy-Redmond transmission line located in Deschutes County, Oregon.