Timber Tap to Forest Grove-Keeler #1 Access Roads CX(s) Applied: B1.3 Date: 09/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 20, 2013Timber Tap to Forest Grove-Keeler #1 Access Roads
CX(s) Applied: B1.3
Date: 09/20/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to maintain existing access roads along approximately 11 miles of the Timber Tap to Forest Grove-Keeler No. 1 transmission line from structure 1/1 to 11/1.
CX(s) Applied: B1.3
Date: 09/20/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to maintain existing access roads along approximately 11 miles of the Timber Tap to Forest Grove-Keeler No. 1 transmission line from structure 1/1 to 11/1.