CX-011241: Categorical Exclusion Determination

Chemawa-Salem #1 & #2 Access Roads CX(s) Applied: B1.3 Date: 09/27/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

September 27, 2013
Estimated Read Time   min
Chemawa-Salem #1 & #2 Access Roads
CX(s) Applied: B1.3
Date: 09/27/2013
Location(s): Oregon
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) is proposing to improve existing access roads associated with the Chemawa-Salem #1 and #2, 115-kilovolt, transmission line right-of-way that currently inhibit access at specific locations for routine maintenance.