Provide land surveying services for all SPR sites as needed through the Basic Ordering Agreement (BOA).
Installing a new lift station capable of tying together all existing site lift stations and delivering a minimum of 5,000 gallons per day (GPD) of sewage approximately 3 miles to the Veolia Sewage Treatment Plant as well as demolishing the existing Sewage Treatment Plant.
Remove one deteriorated protective chain-link fencing system and reinstall a replacement system using all new material and hardware.…
Work in connection with the dredging of the raw water intake channel at the Department of Energy’s federal crude oil reserve site located at Bryan Mound.
For the Exchange for Storage Contracts, companies will deliver crude approximately 24mm barrels into all (4) SPR sites for a time period to be delivered back out at a later date.
Determine selected properties of crude oilsduring upcoming crude oil exchange and fill activities.…
On-site testing, inspection, and calibration of the electrical equipment at the main site.…
Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…
Perform a Differential Global Positioning System survey, for XYZ Mapping, of the SPR pipelines.…
Improve the access and egress of heavy truck traffic on and off the BC Site at the South Gate.…