Categorical Exclusion Determinations: Office of Petroleum Reserves

Workover (operations to restore production, such as deepening, plugging back, pulling and resetting lines, and squeeze cementing) of existing wells (including, but not limited to, activities associated with brine, carbon dioxide, coalbed methane, gas hydrate, geothermal, natural gas, oil) to restore functionality,
The subcontractor shall supply all labor, materials, pesticides, transportation and supervision necessary to perform monthly Degas pest control ser…
To perform the work in connection with providing temporary steel to provide stability during removing and replacing the existing roof panels and purlins and installing new structural steel.