Fabricating and placing a new structural steel platform 18 inches above the existing structural steel platforms that access the 4-valve manifold.
Office of NEPA Policy and Compliance
March 10, 2020Fabricating and placing a new structural steel platform 18 inches above the existing structural steel platforms that access the 4-valve manifold.