The Management and Technical Support Services contractor shall provide support to the Strategic Petroleum Reserve Project Management Office (SPRPMO…
The Iberville Parish Utility Department, Plaquemine, Louisiana shall supply the monthly potable water service to the Bayou Choctaw Strategic Petrol…
The Iberville Parish Utility Department, Plaquemine, Louisiana shall supply the monthly potable water service to the Bayou Choctaw Strategic Petrol…
Perform work associated with this sonar services contract at all SPR sites. Tasks include providing sonar analysis software, providing sonar survey…
To perform the work in connection with the Janitorial Services Contract at the SPR Site Bayou Choctaw.
Make water crossing inspections on the non-leased Strategic Petroleum Reserve (SPR) offsite crude oil pipelines.
Tearing down existing cubicles and replacing with new ones.
To remove the existing slab and installing a new concrete slab in the K9 Kennel Building. Installing a cinderblock wall in the center of the K9 kennel and install fencing around the K9 kennels.
To install a concrete containment slab in the WH drumyard with a curb and drain valves.
This emergency repair order is to engineer and install soil stabilization to stabilize the slope failure. Also, the main access road, electrical co…