This is for the addition of two new fire hydrants at Bryan Mound.
Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...
Subcontractor to provide labor, tools, equipment, transportation and supervision to cut trees, brush, and grass for approximately 15 miles long by …
Perform the work in connection with the Janitorial Services Contract at the SPR Site Big Hill.
The subcontractor shall furnish all equipment required to remove old fiber optic cabling from cable trays, fencing, and from raceways into the site…
Supply unleaded gasoline dyed off-road diesel and clear highway grade diesel fuel on an as needed and/or call out basis.
The subcontractor shall provide security alarm monitoring service, system maintenance, and preventive maintenance bi-annually on all security syste…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required to…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
Subcontractor shall provide all material, labor, supervision, tools, transportation, lodging, and test equipment for obtaining pressurized and unpr…