The subcontractor shall Provide all supervision, labor, materials, tools and equipment to perform the work associated with replacing HVAC Systems i…
Perform the work in connection with the installation of above and below ground raceways.
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
This is for the addition of two new fire hydrants at Bryan Mound.
Building 201 - Demolish existing A/C foundations and bollards for units CU-3, CU-4, and CU-1. Building 202 - Demolish air handling system CCUC-19, a packaged air conditioning unit mounted on wood beams on grade. ...
Subcontractor to provide labor, tools, equipment, transportation and supervision to cut trees, brush, and grass for approximately 15 miles long by …
Perform the work in connection with the Janitorial Services Contract at the SPR Site Big Hill.
The subcontractor shall furnish all equipment required to remove old fiber optic cabling from cable trays, fencing, and from raceways into the site…
Supply unleaded gasoline dyed off-road diesel and clear highway grade diesel fuel on an as needed and/or call out basis.