Determine selected properties of crude oilsduring upcoming crude oil exchange and fill activities.…
On-site testing, inspection, and calibration of the electrical equipment at the main site.…
Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…
Perform a Differential Global Positioning System survey, for XYZ Mapping, of the SPR pipelines.…
Improve the access and egress of heavy truck traffic on and off the BC Site at the South Gate.…
Coil tubing cleanout of the West Hackberry SPR brine disposal wells.…
Base Camp Operation services to assist in recovery and restoration after unplanned drawdown…
Fabricating and placing a new structural steel platform 18 inches above the existing structural steel platforms that access the 4-valve manifold.
Subcontractor shall provide all tools, materials , piping, fittings, services, equipment,transportation, facilities and personnel to perform rebuil…
Subcontractor shall provide all tools, materials, piping, fittings, supervision, equipment,transportation, facilities, and services to install a co…