Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to pe…
The contractor shall furnish all equipment and software required to perform the work regarding the upgrade of the Remote Pipeline Valve Satellite T…
This activity is the general operation of a selective laser sinter 3D printer, specifically the FormLabs Fuse1, and associated accesories (i.e. Fus…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision to gas free, clean and in…
Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from not more th…
Make emergency repairs on the Strategic Petroleum Reserve (SPR) system site piping, offsite pipelines, or other designated systems.
The objective of this Project is to assist the United States, Department of Energy (DOE), Strategic Petroleum Reserve (SPR) with preparation of One (1), Biological Assessment (BA), for the Eastern Black Rail at the Big Hill offsite work area including ground truthing of potentially suitable habitat.
Subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services to perform the …
Locate, excavate, and inspect an internal corrosion anomaly on the on the West Hackberry to Lake Charles Meter Station (LCMS) 36-inch diameter, 0.406 w.t., API- 5LX-60.
Contractor shall provide all supervision, labor, materials, tools, and equipment to perform the work associated with demolish and replacing the cru…