Subcontractor shall provide all labor, tools, equipment, transportation and supervision, as required to cut trees, brush and grass from not more th…
Make emergency repairs on the Strategic Petroleum Reserve (SPR) system site piping, offsite pipelines, or other designated systems.
The objective of this Project is to assist the United States, Department of Energy (DOE), Strategic Petroleum Reserve (SPR) with preparation of One (1), Biological Assessment (BA), for the Eastern Black Rail at the Big Hill offsite work area including ground truthing of potentially suitable habitat.
Subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services to perform the …
Locate, excavate, and inspect an internal corrosion anomaly on the on the West Hackberry to Lake Charles Meter Station (LCMS) 36-inch diameter, 0.406 w.t., API- 5LX-60.
Contractor shall provide all supervision, labor, materials, tools, and equipment to perform the work associated with demolish and replacing the cru…
The subcontractor shall Provide all supervision, labor, materials, tools and equipment to perform the work associated with replacing HVAC Systems i…
Perform the work in connection with the installation of above and below ground raceways.
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.