CX-025110: Repair FOIDS System Cables

The subcontractor shall furnish all equipment required to remove old fiber optic cabling from cable trays, fencing, and from raceways into the site…

Office of NEPA Policy and Compliance

June 7, 2021
Estimated Read Time   min

The subcontractor shall furnish all equipment required to remove old fiber optic cabling from cable trays, fencing, and from raceways into the site Control Building and replace with new fiber optic cables.