Capitol Peak Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Shelton-Fairmount No. 1 Switches Replacement Project CX(s) Applied: B1.3Date: 06/18/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Horn Rapids Tap Disconnect Additions CX(s) Applied: B4.6Date: 06/17/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ellensburg-Moxee Line Impairment Correction CX(s) Applied: B4.11Date: 06/17/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Chehalis District Access Road Maintenance CX(s) Applied: B4.6Date: 06/15/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
South Mountain Communication Site Back-up Generator Replacement CX(s) Applied: B1.3Date: 06/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Bellingham Substation Upgrades CX(s) Applied: B1.3Date: 06/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fiscal Year 2015 Snohomish District Danger Pole Replacement Project (Update to previous CX issued 4/23/15) CX(s) Applied: B4.6Date: 06/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Production, Quality Control and Shipment of Radionuclides from the University of Washington CX(s) Applied: B1.3Date: 06/04/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Keeler-Forest Grove Transmission Line Structure Relocations CX(s) Applied: B4.6Date: 06/03/2015 Location(s): OregonOffices(s): Bonneville Power Administration