Categorical Exclusion Determinations: Bonneville Power Administration

Fiscal Year 2015 Snohomish District Danger Pole Replacement Project (Update to previous CX issued 4/23/15) CX(s) Applied: B4.6Date: 06/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Production, Quality Control and Shipment of Radionuclides from the University of Washington CX(s) Applied: B1.3Date: 06/04/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration