Big Eddy-Chemoweth No. 2 Impairment Remedies- Updated Scope of Work CX(s) Applied: B1.3Date: 09/30/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Black Canyon-Emmett No. 1 Transmission Line Title Transfer CX(s) Applied: B1.24Date: 09/29/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Noxon-Hot Springs Structure 17/1 Foundation Stabilization CX(s) Applied: B1.3Date: 09/28/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
St. Helens-Allston No. 1 Access Road Maintenance CX(s) Applied: B1.3Date: 09/27/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Well Refurbishment and Stormwater System Maintenance at Troutdale Substation CX(s) Applied: B1.3Date: 09/21/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Timber Tap to Keeler-Tillamook Temporary Bridge and Access Road Maintenance CX(s) Applied: B1.3Date: 09/21/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Kalispell & Spokane Districts Road Maintenance Project CX(s) Applied: B1.3Date: 09/20/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Mossyrock-Chehalis No. 1 Impairment Rectification CX(s) Applied: B1.3Date: 09/16/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Teton to Targhee Fiber Communication Project CX(s) Applied: B4.7Date: 09/13/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Door Improvements at Columbia Control House and NERC-CIP Upgrades CX(s) Applied: B1.3Date: 09/13/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration