Badger Canyon Substation Upgrades CX(s) Applied: B4.6Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross-Lexington 12/2 Tower Stabilization Project CX(s) Applied: B1.3Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Correction of Western Oregon Line Impairments CX(s) Applied: B1.3Date: 07/20/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Big Eddy-Troutdale No. 1 230 Kilovolt Transmission Line Mile 38 and 39 Priority Conductor Replacement Project CX(s) Applied: B1.3Date: 07/17/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Heating, Ventilation and Air Conditioning (HVAC) Upgrades at Multiple Substations and Radio Facilities CX(s) Applied: B4.6Date: 07/15/2015 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Troy Substation Tap Yard Expansion CX(s) Applied: B4.11Date: 07/14/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line CX(s) Applied: B1.42Date: 07/09/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Washougal Vegetative Maintenance - LURR 20150160 CX(s) Applied: B4.9Date: 07/08/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Rainbow Farms Property Acquisition Funding and Stewardship Funding CX(s) Applied: B1.25Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Wood Pole Replacements on Salem-Grand Ronde #1 & Grand Ronde-Boyer #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration