Categorical Exclusion Determination
Pomeroy Substation Upgrades CX(s) Applied: B4.11Date: 10/27/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Crooked Creek 4 Property Acquisition Funding CX(s) Applied: B1.25Date: 10/27/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Categorical Exclusion Determination
Fairmount Substation 230 Kilovolt Reactor Addition CX(s) Applied: B4.11Date: 10/26/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Use of Allston-Driscoll No. 2 Access Road CX(s) Applied: B4.9Date: 10/26/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Install a Generator at Three-Mile Dam Adult Collection Facility CX(s) Applied: B2.5Date: 10/24/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Osmose Treatment Pilot Project to Inspect and Repair Steel Tower Legs CX(s) Applied: B1.3Date: 10/14/2016 Location(s): Multiple LocationsOffices(s): Bonneville Power Administration
Allston-Clatsop No. 1 Access Road Maintenance CX(s) Applied: B1.3Date: 10/04/2016 Location(s): OregonOffices(s): Bonneville Power Administration