Kalispell-Kerr No. 1 Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 07/06/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Malin-Hilltop #1 Wood Pole Replacement CX(s) Applied: B1.25Date: 07/02/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Chenoweth Substation Water and Sewer Connection CX(s) Applied: B1.3Date: 07/02/2015 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Albany-Eugene No. 1 Nesting Platform Relocation CX(s) Applied: B4.6Date: 07/01/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Bell Substation HVAC Replacement CX(s) Applied: B1.3Date: 06/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Puget Sound Energy Fiber Connection CX(s) Applied: B1.42Date: 06/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross Complex Sally Port Entrance Relocation CX(s) Applied: B4.7Date: 06/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Aberdeen Substation (Grays Harbor PUD) Tree Clearing CX(s) Applied: B1.32Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
St. Johns-St. Helens Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration