North Bonneville-Ross Transmission Line Right-of-way Sale and Temporary Construction Permit - New Four Seasons Lane to 138th Ave. Segment CX(s) Applied: B1.24Date: 07/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Kerr Tie Line Rebuild CX(s) Applied: B4.13Date: 07/30/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Approval of Land Use Review Request for Underground Line Installation in a BPA Right-of-way in Washington County CX(s) Applied: B4.9Date: 07/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Mulkey Ridge Property Acquisition Funding and Stewardship Funding CX(s) Applied: B1.25Date: 07/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Washington County SW 124th Avenue Extension and Water Pipeline Installation CX(s) Applied: B4.9Date: 07/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Chenoweth-Harvey Transmission Line Sale CX(s) Applied: B1.24Date: 07/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Pearl-Keeler No. 1 Transmission Line Property Sale and Construction Easement CX(s) Applied: B1.24Date: 07/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Ellensburg Substation Expansion and Control House Addition CX(s) Applied: B4.11Date: 07/23/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project CX(s) Applied: B1.7, B2.2Date: 07/22/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fiscal Year 2016 Technology Innovation Portfolio CX(s) Applied: B5.1Date: 07/22/2015 Location(s): OregonOffices(s): Bonneville Power Administration