Ross Complex Road Project CX(s) Applied: B1.32Date: 11/12/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Olympia Substation NERC-CIP Upgrade CX(s) Applied: B2.5Date: 11/12/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Washougal 17th St. and NE 380th Ave. Paving - LURR 20150442 CX(s) Applied: B4.9Date: 11/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ouagga Mussel Study Funding CX(s) Applied: B3.16Date: 10/29/2015 Location(s): NevadaOffices(s): Bonneville Power Administration
Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation (update to previous CX issued September 14, 2015) CX(s) Applied: B4.7Date: 10/26/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Vantage Substation-Control House, Fire Detection and Alarm Installs CX(s) Applied: B2.2Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Communication Equipment Removals (#WC Projects) CX(s) Applied: B1.19Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Midway Substation Upgrades CX(s) Applied: B4.6Date: 10/20/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ravalli Property Acquisition Funding CX(s) Applied: B1.25Date: 10/15/2015 Location(s): MontanaOffices(s): Bonneville Power Administration
Dworshak Passive Repeater project CX(s) Applied: B1.19Date: 10/13/2015 Location(s): IdahoOffices(s): Bonneville Power Administration