Electric Lightwave Fiber Optic Cable near Columbia Substation CX(s) Applied: B4.7Date: 01/25/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross Complex Bridge and Speed Feedback Sign Project CX(s) Applied: B1.13Date: 01/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Hood River-Coop Transmission Line Wood Pole Replacements CX(s) Applied: B1.3Date: 01/20/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Noble Oaks 2 Property Acquisition and Stewardship Funding CX(s) Applied: B1.25Date: 01/19/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Vera Tap to Trentwood-Valley Way Transmission Line Rebuild (update to previous Categorical Exclusion issued on January 16, 2015) CX(s) Applied: B4.13Date: 01/15/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 (update to previous CX issued on 01-05-16) CX(s) Applied: B1.7, B2.5, B4.6Date: 01/12/20...
Install Concrete Slab at Pendleton Fish Acclimation Facility CX(s) Applied: B2.5Date: 01/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Electronic Equipment, Heating, Ventilation and Air Conditioning, and Security System Replacement and Upgrades at Existing Buildings or Facilities - 2016 thru 2017 CX(s) Applied: B1.7, B2.5, B4.6Date: 01/05/2016 Location(s): Multiple LocationsOffices(s)...
Radio Upgrades at Franklin, Nine Mile, and Walla Walla Substations CX(s) Applied: B1.19Date: 12/11/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ferry Butte Communication Facility Upgrades CX(s) Applied: B1.19Date: 12/10/2015 Location(s): IdahoOffices(s): Bonneville Power Administration