ELI Fiber Splicing Project at Salem Substation CX(s) Applied: B4.9Date: 04/12/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Big Eddy-Redmond Transmission Wood Pole Replacement CX(s) Applied: B1.3Date: 04/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
National Oceanographic and Atmospheric Administration Sockeye Salmon Captive Broodstock Program Routine Maintenance CX(s) Applied: B1.3Date: 04/06/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Installation of Metering Equipment near North Bench and Bonners Ferry Substations CX(s) Applied: B4.9Date: 04/01/2016 Location(s): IdahoOffices(s): Bonneville Power Administration
Kitts Corner Wireless Communication Facility CX(s) Applied: B1.19Date: 03/31/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Happy Camp-Hilltop Radio Path Replacement Project CX(s) Applied: B1.19Date: 03/31/2016 Location(s): CaliforniaOffices(s): Bonneville Power Administration
Surprise Lake Substation Sale of Land Rights and Equipment CX(s) Applied: B1.24Date: 03/28/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Wren Substation Fence Replacement CX(s) Applied: B1.11Date: 03/28/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Cape Horn Vista Land Acquisition CX(s) Applied: B1.25Date: 03/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Sale of Structure 2/6 of East Ellensburg Tap to Columbia-Ellensburg No. 1 Line CX(s) Applied: B1.24Date: 03/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration