Anaconda Substation Control House Floor Asbestos Abatement CX(s) Applied: B1.16Date: 04/25/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Echo Lake-Maple Valley No.1 Footing Repair Project: Structure 10/2 CX(s) Applied: B1.3Date: 04/22/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Jocko Hollow Property Acquisition Funding CX(s) Applied: B1.25Date: 04/22/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Hat Rock Substation Upgrades CX(s) Applied: B4.1Date: 04/22/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Grandview-Red Mountain #1 Wood Pole Replacement CX(s) Applied: B1.3Date: 04/20/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Centipede Creek Property Acquisition Funding CX(s) Applied: B1.25Date: 04/20/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Fiscal Year 2016 Wood Pole Replacement – Grand Coulee Transmission Line Maintenace CX(s) Applied: B1.3Date: 04/19/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Addy-Cusick No. 1 Mile 20 to 22 Road Improvement & Ford Construction CX(s) Applied: B1.3Date: 04/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fairview-Bandon No. 1 Span 12/2 Impairment Remedy CX(s) Applied: B1.3Date: 04/15/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Marion-Alvey Transmission Line Mile 1-43 Access Road Upgrade Project CX(s) Applied: B1.3Date: 04/14/2016 Location(s): OregonOffices(s): Bonneville Power Administration