Categorical Exclusion Determinations: Bonneville Power Administration

Fiscal Year 2016 Danger Pole Replacement Project for Fidalgo-Lopez #5 Structure 7/1  CX(s) Applied: B1.3Date: 02/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
McNary-John Day Transmission Line Mile 34-38 Access Road Repair Project CX(s) Applied: B1.3Date: 02/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Damper Installations on the Cougar-Thurston #1 Transmission Line Corridor  CX(s) Applied: B1.3Date: 02/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration