CX-016879: Access Road Easement Acquisitions – 2017 through 2020

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

September 20, 2017
Estimated Read Time   min

The Bonneville Power Administration is proposing to remedy 4 impairments along the Noxon-Libby No. 1 corridor ahead on line from structures 14/4, 14/5, 17/1, and 21/1. Impairments occur when the distance between a surface and the overhead conductor are not sufficient to meet safety and reliability standards. The proposed project would occur within the Kootenai National Forest in Lincoln County, Montana.