Brown Atchison Electric Cooperative will complete a system resiliency project, which includes two components: (1) improvements to the transmission …
Sumner Cowley will replace transmission line poles along power transmission lines that serve three of the cooperative's substation, which provide p…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throug…
Bonneville Power Administration (BPA) proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipme…
Bonneville Power Administration (BPA) proposes to install a new digital substation control house inside the Paul D. Johnson Substation, located wit…
Proposed project activities will making several critical utility pole replacements/removals and transmission rebuild infrastructure upgrades in are…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…
The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two…
The projects will require clearing and grubbing of forested areas totaling approximately 1-2 acres followed by grading to construct a 1 MW Battery …
Proposed project activities will include 30 pole relocations and replacements (transmission with distribution under-build) serving rural and tribal…