CX-035904: Distributed Energy Resources Component Installation on FIGR Tribal Lands

Six 15KWh LFP batteries and an energy management system will be installed at the FIGR farm property which is considered critical infrastructure by …

Office of NEPA Policy and Compliance

May 22, 2026
Estimated Read Time   min

Six 15KWh LFP batteries and an energy management system will be installed at the FIGR farm property which is considered critical infrastructure by the tribe. This will provide a total of 90KWh of battery backup storage. Equipment will be wall mounted on existing infrastructure.