Bonneville Power Administration (BPA) proposes to expand the Cold Creek Yard located on the Ross Complex, by converting BPA fee-owned rights-of-way…
The City of Valley City proposes to replace 1.9 miles of transmission structures (38) wood poles with round steel poles and upgrad the 69KV insulat…
(1) replace distribution and transmission structures with higher wind rated poles to meet wind load criteria, (2) install an energy storage/deliver…
Brown Atchison Electric Cooperative will complete a system resiliency project, which includes two components: (1) improvements to the transmission …
Sumner Cowley will replace transmission line poles along power transmission lines that serve three of the cooperative's substation, which provide p…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throug…
Bonneville Power Administration (BPA) proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipme…
Bonneville Power Administration (BPA) proposes to install a new digital substation control house inside the Paul D. Johnson Substation, located wit…
Proposed project activities will making several critical utility pole replacements/removals and transmission rebuild infrastructure upgrades in are…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…