Install and replace a three-phase 75 KVA transformer on Kennedy Rd and Flying Tiger Way. Install and replace a three-phase 75 KVA transformer on Ch…
BPA proposes to allow T-Mobile to upgrade its telecommunications equipment located at structure 2/5 of BPA's Covington-White River Nos. 1 and 2 Tra…
Administration (BPA) proposes to allow AT and T to upgrade its telecommunications equipment at its Redland South wireless site, located on structur…
The Grid Defense Project consists of substation and circuit improvements in Fort Smith, Sebastian County, Arkansas by installing new automation and…
Installation of battery energy storage systems and microgrid switchgear for integration into the SBCC_Hub microgrid.…
Construction of a 34.5 - 14.4/24.94Y, 12/16/20 MVA substation including, but not limited to, disturbing an area of not more than two (2) acres by c…
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …
Bonneville Power Administration (BPA) proposes to reconductor the first two spans (approximately 250 linear feet) of the 138-kilovolt (kV) Heyburn-…
BPA proposes to reconfigure bays and install new equipment inside the existing BPA Pearl Substation in Sherwood, Oregon. The proposed work would ac…
Installing new feeder lines from the switchgear to the substation transformer. …