Remove the wooden transformer platform at 501-A per E-FCR-A-00216 which will consist of performing electrical modifications such as removing existi…
Project RELIEF will deploy advanced high-temperature, low-sag (HTLS) conductors on 250 miles of transmission lines, leading to 2x capacity increase…
Upgrading voltage from 2.4kV Delta to 12.5kV Wye, Replacing obsolete hardware with updated components, Completing the loop feed will ensure that po…
Install 4 115 KV capacitor banks, optical ground wire for communications, and SCADA for increased monitoring of grid components. …
Replacement of 34 electric line protective and switching devices with SCADA-capable upgraded equipment.…
Update distribution system in Ansley's entire service area from 2.4kV delta to 12.5kV grounded wye. Replace poles, transformers, overhead conductor…
Install new electronic reclosers (with control panels), install distribution automation radios with ethernet ports, and install new software and pr…
Installation of 8-651RA Recloser Relay's, Testing of the remainder of existing relay's and coordination study between Breaker Relays and Recloser R…
Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to reconfigure and expand the substation yard at BPA’s Bri…
Construction of new 46kV sub-transmission line for 2 City owned electrical substations. Installation of isolation switches in the 46kV sub-transmis…