The scope of activities for this project will be the installation of equipment, equipment reconductoring and existing wooden pole replacement along…
The replacement of all poles, wire and materials needed to hold equipment to poles.…
Rebuild 2.4 miles of distribution line and construct 2.4 miles of transmission on the same poles.…
PWC will implement advanced technologies and equipment that will support increased system visibility, the use of autonomous controls, integration o…
Replacing three manual switches and three oil circuit reclosers with SCADA remote controlled electronic reclosers…
1. Deploy substation transformers, 2. Replace circuit breaker, 3. Install network reclosers along with their accompanying controllers and Remote Te…
Distribution substation upgrade, five sections of overhead distribution lines conversion to underground, 3-phase overhead line rebuild, and SCADA s…
Replacing old existing wooden poles with new wood poles along with new hardened conductors, insulators, and down guys. …
(1) hardening or undergrounding of over 950 distribution poles, (2) hardening 57 transmission spans, (3) installing Fault location, isolation and r…
Building construction (concrete, footings, raceways/troughs), electrical equipment installation.…