This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…
Marias River Electric Cooperative (MRE) plans to install new 69kV breakers at the 4-Corners Substation located just west of Oilmont, MT. …
Removal of approximately 1,257 existing AMR meters, installation of approximately 1,257 new AMI meters, installation of AMI software and 2 gateway …
The scope of activities for this project will be the installation of equipment, equipment reconductoring and existing wooden pole replacement along…
The replacement of all poles, wire and materials needed to hold equipment to poles.…
Rebuild 2.4 miles of distribution line and construct 2.4 miles of transmission on the same poles.…
PWC will implement advanced technologies and equipment that will support increased system visibility, the use of autonomous controls, integration o…
Replacing three manual switches and three oil circuit reclosers with SCADA remote controlled electronic reclosers…
1. Deploy substation transformers, 2. Replace circuit breaker, 3. Install network reclosers along with their accompanying controllers and Remote Te…
Distribution substation upgrade, five sections of overhead distribution lines conversion to underground, 3-phase overhead line rebuild, and SCADA s…