REPLACE 3836 RF METERS WITH AMI METERS. Install one 100' tower and base station.…
REPLACE 2909 RF METERS WITH AMI METERS. Install seven 100' towers and base stations.…
East River Electric Power Cooperative (ERC) is upgrading the Arlington Tap facility on the WAPA Watertown - Brookings 115 kV transmission line. WAP…
WAPA would acquire additional land around Wessington Springs Substation to mitigate erosion from the substation and minimize damages from neighbori…
The proposed actions consists of adding a grounding transformer to the Woonsocket Substation. Staff would also move the fence between the gates out…
Installing 225 Trip Saver Devices, Replacing 78 poles, and install 3 switches. …
The DOE Loan Programs Office is considering whether to issue a loan guarantee of a funding facility to the Alabama Power Company pursuant to its authority under the Energy Infrastructure Reinvestment 1706 Program.
Sub-recipient will Install electric grid fault and line sensors, reclosers and telecommunication equipment, replace distribution poles with composi…
Construction related activities for equipment replacement and/or upgrades. This may include pole replacement, traversing unpaved roads, storage of …
This is a targeted, reliability and resiliency improvement driven project at the Leesburg Electric North Substation for the replacement of an out o…