Tullahoma Utilities Authority (TUA) plans to install regulator banks at three primary substations serving all 12 distribution circuits and integrat…

Office of NEPA Policy and Compliance

July 16, 2026
Estimated Read Time   min

Tullahoma Utilities Authority (TUA) plans to install regulator banks at three primary substations serving all 12 distribution circuits and integrate the new equipment with its current Supervisory Control and Data Acquisition (SCADA) system to enable real-time monitoring and remote control of the local grid system.