The project seeks to expand critical grid management capabilities by boosting network capacity, enhancing control of loads from inverter-based reso…
Bonneville Power Administration (BPA) proposes to temporarily remove the 15 kilovolt (kV) station service cable located beneath Ridder Road between…
Bonneville Power Administration (BPA) proposes to remove, replace, upgrade, and/or modify outdated equipment at Columbia Substation. BPA would perf…
On October 6, 2014, DOE issued Presidential Permit No. PP-362, authorizing Champlain Hudson Power Express, Inc. (CHPEI) to construct, operate, main…
Purchase and Installation of utility scale battery storage for electric distribution grid resilience demonstration.…
Increase the resiliency and reliability of renewable hydroelectric generation-based grid through battery energy storage system integration.…
Remove the three phase overhead power line located on the East side of US-75 from the service pole for One Fire Casino, North to the intersection o…
Install five (5) new monitoring and control points on existing utility poles in existing ROW.…
Rebuild three-phase Duke Energy line in existing ROW. Cut 1.1 miles of ROW along West McConnells HWY and install new single phase phase pole line …
Installation of new equipment on existing poles that will allow a self healing network to automatically isolate and restore power, within seconds, …