CX-032975: PGE Reconductor Project Crossing BPA's Keeler-Oregon City-2 on BPA Fee-Owned Right-of-Way
Bonneville Power Administration (BPA) proposes to authorize Portland General Electric (PGE) access to BPA fee-owned right-of-way (BPA ROW) to recon…
This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…
WV/MD SMART Grid is an investment across West Virginia and Maryland communities that includes installing SCADA software in under-served areas, inst…
Rebuild of approximately 6.25 miles of main line feeder on De Queen Circuit 961100 with heavier class poles, stronger cross arms, and shorter span …
This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…
Marias River Electric Cooperative (MRE) plans to install new 69kV breakers at the 4-Corners Substation located just west of Oilmont, MT. …
Removal of approximately 1,257 existing AMR meters, installation of approximately 1,257 new AMI meters, installation of AMI software and 2 gateway …
The scope of activities for this project will be the installation of equipment, equipment reconductoring and existing wooden pole replacement along…
The replacement of all poles, wire and materials needed to hold equipment to poles.…
Rebuild 2.4 miles of distribution line and construct 2.4 miles of transmission on the same poles.…