Categorical Exclusion Determinations: B4.6

The proposed project is broken into two parts, with the first part covering reconductoring and reconstruction of a single-phase line serving the po…
Replacing old AGOD (Automated Gang Operated Disconnect) blade switches involves removing and retiring the outdated one before installing a new sma…
This project will rebuild a 1950's transmission and distribution line with modern materials, upgrading the poles, shortening spans, and upgrading t…
Upgrading mining site to 3-phase power. Trenching to place 3-phase line underground. Installation of a power vault and transformer. Installation of…