Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…
A new 69 kV transmission line 4.0 miles long will be constructed from the existing Winlock substation (corner of SW Kerron St. and Hining Ave.) to …
The Department of Energy Loan Programs Office is considering whether to issue a Title XVII Energy Infrastructure Reinvestment Program loan guarantee to Wisconsin Power and Light for the Grant County Battery Energy Storage System Project.
Replace an outdated generator(engine) with a new generator(engine)…
Installation of 19 sets of electronic reclosers in existing distribution substations including communications equipment in the substation building…
To facilitate the new lighting, eleven new poles would be required with fiber optic cable and access to an air compressor for support.…
Bonneville Power Administration (BPA) proposes to replace disconnect switches at structures 9/4, 9/7, and 11/2 and to reconfigure transmission stru…
Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to improve electric service reliability at BPA’s 230-kilov…