The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Rebuild nearly six miles conductor electric service lines and replacing aged and damaged poles, change out 8 controls, and relocate 1.2 miles of li…
Installation of approximately 6,000 ft. of 15 kV submarine distribution cable beneath the Fox Islands Thoroughfare in Penobscot Bay, Maine. 44.1325…
Deploy and catalyze technology solutions that increase the flexibility, efficiency, reliability, and resilience of the electric power system.…
Install a synchronous condenser at the Port Allen Generation Station (PAGS), developed through conversion of an existing, but essentially stand-by …
I and M intends to install DACR typically in the form of "smart" reclosers on the distribution grid across its Indiana territory which will provide…
This project will upgrade, replacement of 2 new stainless step up feed/distribution transformers and associated hardware and components. Project wi…
The City of Oakley has requested that WAPA relocate and install two wood poles for towers 18-7 and 18-8 and remove pole 18-6, currently adjacent to…
Add 10 SCADA controlled triple single reclosers. Each of the 10 sites includes adding a 12.47/7.2 kV breaker, adding a weather proof control box at…
Install Tripsaver programmable reclosers in Dodge City and rural Ford County. 1/8th of the support structures may require replacement.…