This project includes the installation of two Pano AI cameras and six IntelliRupter PulseClosers on existing distribution infrastructure, both of w…
WAPA is proposing to raise some of its structures along our Oahe to Glenham transmission line.…
Upgrading 3 three-phase overcurrent protective reclosers and 4 single-phase overcurrent protective reclosers in, and near, Kelton Substation. All r…
Brush clearing along utility easement on Santa Rosa Band of Cahuilla Indian Reservation, totaling 33.7 acres, 11.6 miles in total. Replace 7 wood p…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throug…
Replace the XLPE cable in affected project area with a 2 inches HDPE duct, which will house the new ethylene propylene rubber (EPR) insulated jacke…
1. New Transformer installed in existing substation 2. New Vacuum Breaker Installed 3. Concrete containment around new transformer 3 Install new bu…
Bonneville Power Administration (BPA) proposes to rebuild its Hood River Co-Op Service No. 1 transmission line from Hood River Substation to struct…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…
Bonneville Power Administration (BPA) proposes to remove and replace transmission structures and to remove and restring conductor and fiber optic c…