CX-034190: Wessington Springs Substation Land Acquisition

WAPA would acquire additional land around Wessington Springs Substation to mitigate erosion from the substation and minimize damages from neighbori…

Office of NEPA Policy and Compliance

July 14, 2025
minute read time

WAPA would acquire additional land around Wessington Springs Substation to mitigate erosion from the substation and minimize damages from neighboring Cattle. New barbed wire fence would be installed. Repair/stabilize eroded areas as required.