Construct 20'x60' structure in which Substation/Switchgearwill be installed. Excavate trenches for conduit installation between Power Plants and S…
Office of NEPA Policy and Compliance
May 16, 2025Construct 20'x60' structure in which Substation/Switchgearwill be installed. Excavate trenches for conduit installation between Power Plants and Substation/Switchgear Structure, Excavate for foundation of 40'x60', erect wood frame bldg and install Switchgear,HVAC and house electrical.