Bonneville Power Administration (BPA) proposes to replace electrical equipment at BPA's Grizzly Substation. …
Bonneville Power Administration (BPA) proposes to interconnect Avangrid’s 202-megawatt (MW) solar development project with BPA’s electrical system …
Substation modifications, installation, and testing the grid-ready flexible transformer, GRFT, prototype at Cooperative Energy’s Columbia Substatio…
DOE proposes to install electrical power backup capability at LBNL’s switch station SW-A6 as a temporary pilot project.…
The project will reconfigure the plant power supply and distribution system to transition to a more adequately sized 138kV supply.…
The CCT would conduct actions and implement portions of the Northern Pike Suppression Plan.…
BPA proposes several improvements at Covington and Raver substations in King County, Washington.…
The project scope includes the following, expand the yard to the southeast for a new 115-kV area, replace transformer KY1 A and relocate, construc…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove all WAPA-owned substation equipment at the Malta (MAL)…
Demolish existing electrical interconnect and install a pre-fabricated enclosure, switchgear, switching station, and support equipment.…