Upgrade /Replace the primary electrical distribution infrastructure for the south quarter of the NETL-Albany, Oregon site to increase capacity, rel…
Bonneville Power Administration (BPA) proposes to interconnect two 20-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
Bonneville Power Administration (BPA) proposes to interconnect two 20-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
The under-construction Fleet Services Building (FSB) – a 36,000 square-foot multi-purpose mobile equipment and transportation center in the JD Ross…
Bonneville Power Administration (BPA) is proposing to upgrade equipment at Longview Substation, the Longview Annex, and Allston Substation. The wor…
Bonneville Power Administration (BPA) proposes to interconnect two 10-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
The Tennessee Valley Authority (TVA) is designing, constructing, and will be operating a new substation for the U.S. Department of Energy (DOE) at …
U1a Modernization (U1a-M) is a multi-year set of activities and projects that would design and construct the necessary infrastructure and utilities…
The Bonneville Power Administration (BPA) proposes to install a new Power Control Assembly (PCA) building and to remove the existing control house …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve a request by Tri-State Generation and Transmission Assoc…