The Bonneville Power Administration proposes to construct interconnection facilities (a tap) on the existing Franklin-Badger Canyon No.1, 115-kilov…
At Alcoa's expense, the Bonneville Power Administration proposes to replace fourteen conductor hardware assemblies for seven low voltage feeders (2…
Beresford Municipal Utilities (BMU) is proposing to construct a new 115kV electrical transmission line to source a new substation to be constructed…
DOE at the Paducah Gaseous Diffusion Plant (PGDP) plans to design and construct a new electrical distribution system to bypass the C-531 Switchyard.
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Award Number: DE-AC36-08GO28308CX(s) Applied: B4.11, B4.12, DOE/EA-1914NRELLocation(s): COOffice(s): Golden Field Office
Categorical Exclusion Determination
Categorical Exclusion Determination