The project objective is to install two 138kV transmission lines connecting Argonne's 551 substation with a new ComEd substation south of the Argon…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve an interconnection request from PacifiCorp (dba Rocky Mo…
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
The Bonneville Power Administration (BPA) proposes to construct four new wood pole structures, string new conductor on and around them, remove an e…
Upgrade /Replace the primary electrical distribution infrastructure for the south quarter of the NETL-Albany, Oregon site to increase capacity, rel…
Bonneville Power Administration (BPA) proposes to interconnect two 20-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
Bonneville Power Administration (BPA) proposes to interconnect two 20-megawatt (MW) solar development projects to BPA’s electrical transmission sys…
The under-construction Fleet Services Building (FSB) – a 36,000 square-foot multi-purpose mobile equipment and transportation center in the JD Ross…
Bonneville Power Administration (BPA) is proposing to upgrade equipment at Longview Substation, the Longview Annex, and Allston Substation. The wor…
Bonneville Power Administration (BPA) proposes to interconnect two 10-megawatt (MW) solar development projects to BPA’s electrical transmission sys…