Install a prefabricated building immediately north of the existing metal building. Reroute the existing conductors from the existing building to th…
Office of NEPA Policy and Compliance
November 8, 2024Install a prefabricated building immediately north of the existing metal building. Reroute the existing conductors from the existing building to the new building.